finished, at last!

I know some of you won’t believe this (Jen C, I’m looking at you!) but my double knit, 67 rows of non-repeating colorwork cowl is done. Totally and completely. The top has been kitchenered, the ends tucked inside, and it was even blocked. Amazing. Let’s start with the finished photos for you to ooh and aah over.

Finished Tapestry Cowl
The pink side.

Finished Tapestry Cowl
The brown side (the one I think I will keep facing out.

It's Warm
A quick modeled shot. This thing is warm!

It felt so good to set this project to completed on Ravelry and not have it show up as WIP anymore. To recap, I started this cowl in 2008. I fell in love with the pictures of it on Ravelry and someone else in my knitting group was making it and it seemed like such a good idea. Then I got about 19 rows into the 110 stitches of (as I already said) nonrepeating double knit colorwork and lost my steam. Last November I picked it up again and got down to knitting. A couple of weeks later, the colorwork was finished. I am not sure how long after that all of the knitting was done but it didn’t take long. Then I started doing the kitchener stitch of the 220 stitches at the top… and messed up. Since knitting seems to exacerbate my elbow issues I decided to bring it to knitting night last week as a nonknitting knitting project. I messed up the kitchener again but Veronica showed me how she does it so I could see what I was doing wrong. (Can I just say I haven’t done kitchener stitch in a while? That is my story and I’m sticking to it.)

And now it’s done. Before the mornings are bitter cold. I am really looking forward to wearing it while biking with the kids to school during the cold (for California) winter mornings.

And Jen C and Jen S (who both knit much larger double knit projects than this) you can laugh at me for this taking so long, just do it quietly and where I can’t hear you.

Advertisement